Through the Hsuehshan Tunnel, under the old divide
A road beneath the Xueshan Range, a difficult build that took about fifteen years, and a new crossing between Taipei and Yilan.
by Omar and Lou

- Out of Taipei
- about 1 h by bus
- Where on the coast
- whole county
The Hsuehshan Tunnel is about 12.9 km long, running beneath the Xueshan Range between Pinglin in New Taipei and Toucheng in Yilan. It’s a straightforward line on a map, though the work of making that line took about 15 years, and the route changed the shape of the Taipei–Yilan crossing.
Morning, before the tunnel
Before the tunnel opened, most road traffic between Taipei and Yilan crossed the mountains on Provincial Highway 9. That detail gives the tunnel its measure: not simply a long piece of road, but a different passage through the range. We find ourselves holding both routes in mind, the road over the mountains and the road beneath them, because the change is easiest to understand as a change in how the crossing is made.
The earlier road doesn’t have to become a symbol, and we won’t pretend we know more about it than the facts allow. It carried most of the road traffic between the two places before the tunnel opened; the new route runs under the range. Even that plain before-and-after is substantial. A county’s place in a journey can shift when the way through it changes, and here the tunnel gives the Taipei–Yilan connection a new line to follow.
We’d linger over that word “most,” which leaves room for other ways across without asking us to invent them. The tunnel doesn’t erase the older crossing from the story; it sits beside a history in which Provincial Highway 9 carried the bulk of road traffic. For us, the useful comparison is that simple one, rather than a claim about how long a journey takes or what every traveller now chooses.
Midday, three bores under a range
The tunnel opened on 16 June 2006. When it opened, it was the longest road tunnel in Taiwan, a fact that gives its length a particular weight without needing any extra superlatives. About 12.9 km is already a number that asks us to pause; it’s long enough to make the crossing feel like its own piece of infrastructure, not just a short cut through a hill.

Its layout has twin bores, one for each direction, with a smaller pilot tunnel between them. We like the spare clarity of that arrangement: two main passages, each assigned a direction, and a smaller one between. The description is practical, but it also makes the scale easier to picture. The tunnel isn’t a single opening in the range; it’s a set of three passages built beneath it.
Then there’s the length of the build. Work took about 15 years, slowed by water inflows and rock collapses. Those are not incidental complications in the story; they’re the reason the project took so long. We can’t know the experience of working through them from these few facts, and we won’t dress the difficulty up as an adventure, but the time involved tells us this was a demanding piece of construction.
Several workers died during the building of the Hsuehshan Tunnel. That fact belongs in the story plainly, without turning it into a passing detail or adding a scene we can’t support. It changes how we read the tunnel’s opening date and its record length: not as a tidy engineering milestone on its own, but as the end of work that had a human cost.
Work took about 15 years, slowed by water inflows and rock collapses.
Late afternoon, a road with a name
Freeway 5 is officially named the Chiang Wei-shui Memorial Freeway, after the doctor the road is named after. The road is the Chiang Wei-shui Memorial Freeway; the tunnel carries traffic beneath the Xueshan Range between Pinglin and Toucheng. We’re drawn to the way the official name and the engineering story sit together without needing to compete for attention. One names the freeway, the other describes the crossing.

That’s where the tunnel’s effect on Yilan comes into focus for us: the county is connected to Taipei by a road route that now passes under the range, where most road traffic once crossed the mountains on Provincial Highway 9. We don’t need to claim a precise travel-time change to see why that matters. The route itself is different, and the tunnel’s scale makes that change hard to mistake.
We’d probably disagree about which fact stays with us longest. One of us returns to the about 15 years of work, slowed by water and collapses; the other keeps thinking about the twin bores, each carrying traffic in one direction. Neither detail stands alone, and both lead back to the same opening in the calendar: 16 June 2006, when a long, difficult build became a road crossing.
By late afternoon, we’re left with the two place names at either end of the tunnel: Pinglin in New Taipei, Toucheng in Yilan, and the Xueshan Range between them. The old mountain crossing remains part of the account, but the tunnel gives the journey another line beneath the range. It’s a small map in the mind, and we let it sit there for a moment before moving on.
| Route | Under the Xueshan Range, between Pinglin and Toucheng |
|---|---|
| Length | About 12.9 km |
| Opened | 16 June 2006 |
| Build | About 15 years |
Nine bends and eighteen turns, still in motion
The little coast stations
A detour on the Pingxi line, from morning to late afternoon